JSEC Solutions

Interim management.

Leading a technical team or a critical project for as long as it takes: stabilise, decide, deliver, then hand over.

Mission plan · assessment, leadership, handover

You are probably in one of these situations.

An interim mission has a start, an end and a written objective. It succeeds when the team no longer needs me.

  • A technical head is leaving, and replacing them will take months.
  • A critical project is slipping: certification, industrialisation, transfer.
  • An acquisition means taking over products and teams.

What I actually do.

01

Interim leadership

R&D, engineering or product quality, with written objectives from day one.

02

Critical project

Assessment, replanning, trade-offs, supplier follow-up.

03

Organisation

Roles, routines, upskilling, hiring the successor.

04

Product takeover

Technical status, obsolescence, knowledge transfer.

05

Fractional

Part-time technical leadership, over the long run.

Deliverables

Ref.Deliverable
D130-day first-impressions report
D2Action plan and dashboard
D3Target organisation and job descriptions
D4Handover file for the successor

Methods

Phase reviewsMilestones, gate criteria, project risk management
Lean, 8D, SPCContinuous improvement and problem solving
ISO 9001Quality management system
IEC 60601, IEC 61010Product standards for medical and laboratory equipment

Frequently asked questions

How long?

Usually three to nine months, longer on a fractional basis. The end is planned from the start.

Under what contract?

Directly, or through an interim management firm.

A project to move forward? Let's talk.

Three lines are enough: the topic, the stage, the deadline. Reply within two business days.

Use the contact form →
Based inSaint-Maximin-la-Sainte-Baume, France

Please do not send confidential documentation before a non-disclosure agreement has been signed.

Email LinkedIn Your project