JSEC Solutions

Electromedical design and verification.

Getting a device through IEC 60601 testing the first time, then keeping it compliant for its whole commercial life.

Exploded view · insulation and creepage reviewed before testing

You are probably in one of these situations.

The later an electrical safety or EMC issue is found, the more it costs. My job is to surface it before the test lab does.

  • Testing is approaching and the list of applicable standards is not settled.
  • A test report has come back with electrical safety or EMC failures.
  • A component is going obsolete and its replacement needs assessing.

What I actually do.

01

Standards strategy

General, collateral and particular standards identified, every non-applicable clause justified.

02

Essential performance

Defined from the risk analysis, with the acceptance criteria for EMC testing.

03

Design review

Insulation, creepage, leakage currents, filtering and shielding reviewed before the lab.

04

Verification plan

Requirements-to-tests matrix, lab selection, attendance during testing.

05

Test failures

Cause found, fix verified, impact on other tests assessed.

06

Production life

Obsolescence, supplier changes, impact of design changes.

Deliverables

Ref.Deliverable
D1Justified list of applicable standards
D2Insulation diagram and means-of-protection table
D3Verification plan and traceability matrix
D4Pre-test assessment report
D5Test failure analysis file

Standards

IEC 60601-1General requirements for basic safety and essential performance
IEC 60601-1-2Electromagnetic disturbances
IEC 60601-1-6 / IEC 62366-1Usability
IEC 60601-1-8Alarm systems
IEC 60601-1-11Home healthcare environment
IEC 60601-2 seriesParticular requirements by device type
ISO 14971Risk management

Frequently asked questions

Do you run the tests?

No: an accredited lab runs them. I prepare them, follow them and interpret the results.

Can you attend testing?

Yes, on site or remotely, to decide on a fix without waiting for the written report.

Does a change mean repeating tests?

Not always: the impact assessment separates tests to repeat from those that can be justified by analysis.

A project to move forward? Let's talk.

Three lines are enough: the topic, the stage, the deadline. Reply within two business days.

Use the contact form →
Based inSaint-Maximin-la-Sainte-Baume, France

Please do not send confidential documentation before a non-disclosure agreement has been signed.

Email LinkedIn Your project